New solar and wind under development in Morocco is to be linked with Britain, with developer Xlinks also seeking to develop a cable manufacturing industry.
SSE Renewables is aiming to co-locate hydrogen production facilities at two onshore wind farms in Scotland and Ireland in a partnership with Siemens Gamesa Renewable Energy.
Some 960GW of new solar PV and wind capacity must be deployed globally each year by 2030 to be on track to reach net zero by mid-century, according to new analysis from BloombergNEF (BNEF).
Savings of up to £100 million could be made with the introduction of a national reactive power market according to a trial conducted by National Grid ESO and UK Power Networks (UKPN).
If the UK is to reach 100% renewables at the lowest cost, it will need 49.5GW of flexibility from both storage and gas, according to research from Wärtsilä.