“The IMF is predicting that the UK will see the highest growth of any G7 member in 2022,” said climate minister Graham Stuart, despite the UK being plagued with the ongoing energy crisis.
National Grid has confirmed that 1GW of interconnector capacity will be offline until 27 March 2022, turning to the North Sea Link to help plug the gap.
Minister for investment Gerry Grimstone has lauded the NeuConnect interconnector being developed between the UK and Germany as “a vital contribution to the UK’s green ambitions”.
Battery storage was called into action following the IFA2 interconnector with France – which went live late last month – tripping on Friday (29 January).
The second electricity interconnector between the UK and France is now able to flow low carbon electricity between the two countries at full capacity.
National Grid Ventures and Dutch transmission system operator TenneT have signed a cooperation agreement to link Dutch and British offshore wind farms to the energy systems of both countries.