Connected Energy's E-STOR systems have been installed at two Volvo Trucks UK & Ireland electric vehicle (EV) charging workshops to help manage grid connection restraints.
In early August, the UK’s electricity networks commissioner, Nick Winser, released a landmark report detailing how GB could halve the time that is required to build grid infrastructure.
On behalf of its 80 members, the Electricity Storage Network (ESN) has penned an open letter to National Grid ESO expressing concerns over the Balancing Mechanism (BM) highlighting an average skip rate of 80% for batteries.