National Grid ESO has published its Summer Outlook 2024, detailing a season of interconnector reliability and lower balancing costs than the previous year.
Network operator Northern Powergrid has launched its Spring flexibility tender, which could deliver £7.5 million in deferred network reinforcement costs.
New analysis from Friends of the Earth revealed that 374,900 hectares—totalling 2.9% of land in England—are suitable for new onshore wind and solar farms.
“We, as a community, need to make sure that we are designing, recommending and installing the safest systems”, said Nick Blampied, head of commercial at SolarEdge Technologies UK, during a webinar hosted by Current± this morning (9 April).
E.ON Next has unveiled two new solar export tariff rates designed to offer solar-equipped customers attractive returns when selling excess energy back to the grid.